They started with the area under the balcony and the basement stairwell from the living room.
They moved on to complete the living room ceiling and some of the walls. The way they got into positions to reach the high ceilings was scary!
After which they did the attic storage room above the bathroom. (I thought Dave had water spots on his camera, but after cleaning the lens we figured the spots were from the flash reflecting off all the dust particles in the air.)
They finished the balcony area.
Then they started the kitchen. They have 1/2 of the ceiling done, the dormer front, the breakfast bar area, and inside the bathroom done. Tomorrow they will be back, hopefully to finish. They have walls in the living room and kitchen, and 1/2 the kitchen ceiling to do.
They finished the balcony area.
Then they started the kitchen. They have 1/2 of the ceiling done, the dormer front, the breakfast bar area, and inside the bathroom done. Tomorrow they will be back, hopefully to finish. They have walls in the living room and kitchen, and 1/2 the kitchen ceiling to do.