Tuesday, December 22, 2009

Week 24 moving in

In the past week, the dormer was sheetrocked. Tape and texture is in the process. The plumber and electrician were here today and moved the pressure tank and hot water heater. The electrician also installed the ceiling fans, stove outlet, and pretty much finished up the the electric. We love these ceiling fans! The plumber finally got water connected to the new kitchen and bathroom. We didn't have kitchen plumbing for the past 10 days! The contractor finished installing the kitchen countertops today too. There was a lot of work going on here today!
This Christmas tree is 7.5 ft tall. In my living room at my old house it looked really big. In this living room it looks miniature!

No comments:

Post a Comment