Tuesday, December 22, 2009
Week 24 moving in
Monday, December 14, 2009
Week 23 counters
The other countertops are sitting in place but aren't attached yet.
This 1/2 wall was built by Dave yesterday while I was enjoying a Nutcracker performance in town. You can barely see where the stove is located in the background. That placement was unacceptable to both of us. We intended to have the stove in the island (when we can afford cabinets!) The electrician said they can't put a stove outlet in the floor so Dave built a wall for them to wire the stove in the island area. The plumber is supposed to be here tomorrow and hopefully the electrician will be here Wednesday.
Friday, December 11, 2009
Week 22 more deconstruction
We didn't expect them to take out the kitchen wall until Monday. We planned to empty everything out this weekend. Oh well, they did it for us! Unfortunately, they had to add it to the already crowded old living room!
This is the current state of the living room. Yuck!!!!! See why we needed an addition! Looks like something from one of those "Clean Sweep" type TV shows!
Here is the old kitchen. Under the window was the stove. You can see the water pipes from the sink coming up through the floor.
Thursday, December 10, 2009
Tuesday, December 8, 2009
Week 22 paint
The painter finished primer and has the first coat of paint on the walls.
Monday, December 7, 2009
Week 22 paint

I arrived home tonight to the smell of saurkraut in the crock pot mixed with the smell of paint...yum yum. Dave was home sick today so he got some shots of Duke in action.
Thursday, December 3, 2009
Deconstruction/reconstruction
More deconstruction....the wall between the old living room and the new living room is now gone! Yeah!!!
Most of the ceilings were textured today also. Looks like they just need to do the bathroom ceiling and the ceiling under the balcony and dormer. Painter will be here next week.
Wednesday, December 2, 2009
Deconstruction
I have not been a very good blogger lately! :( Sorry!
Today they textured the walls with a "light orange peel" texture, but it wouldn't photograph well.
Monday, November 23, 2009
Week 20 tape
The tapers were here before I left for work this morning. Today they did corners, inside corners and outside corners. They also did a second coat of mud on the seams. We will be able to use the space on Thanksgiving. The builder is going to take out a section of the wall between the current house and the addition, and clean up the addition area (wish he would clean up the rest of house too!) so we can put up tables and chairs for the holiday. Sounds like the tapers will be back again on Friday and maybe Saturday too. I hope we can get into the space soon enough to decorate for Christmas!


Saturday, November 21, 2009
Week 19 tape
A large heater was brought in early this week to warm the rooms to do the tape and texture. I guess they need it to be a certain temp to apply the mud. Thursday and Friday they taped the seams and started the corners. It's really starting to look like a house! Sure hope we can at least set up a table in there for Thanksgiving dinner!

Tuesday, November 17, 2009
Week 19 locks
Sunday, November 15, 2009
Week 19 sheetrock
Saturday, November 14, 2009
Week 18 sheetrock
The sheetrockers are animals! They were here before 7am and didn't leave until 9:30pm! We spent pretty much the whole day watching them. They didn't "walk" anywhere, even running with 12 ft. sheets of sheetrock! They didn't slow down all day! I guess that is to be expected from a couple of guys in their mid 20's. It was amazing watching how fast it all went up.
They started with the area under the balcony and the basement stairwell from the living room.
They moved on to complete the living room ceiling and some of the walls. The way they got into positions to reach the high ceilings was scary!
After which they did the attic storage room above the bathroom. (I thought Dave had water spots on his camera, but after cleaning the lens we figured the spots were from the flash reflecting off all the dust particles in the air.)
They finished the balcony area.
Then they started the kitchen. They have 1/2 of the ceiling done, the dormer front, the breakfast bar area, and inside the bathroom done. Tomorrow they will be back, hopefully to finish. They have walls in the living room and kitchen, and 1/2 the kitchen ceiling to do.
Friday, November 13, 2009
Week 18 sheetrock
Monday, November 9, 2009
Week 18 soffits, insulation